Department | Manufacturing | Document no | MAN-080 | ||
Prepared by: | Date: | Supersedes: | |||
Checked by: | Date: | Date Issued: | |||
Approved by: | Date: | Review Date: |
Document Owner
Operations Manager
Affected Parties
All operation’s colleagues
Purpose
This SOP specifies the step by step instruction for the production operator to follow during tablet blistering and packing for a BPN. This SOP is written in the form of a protocol so that every time the protocol can be printed and used for different BPN.
Scope
All trained production operators of tablet packing lines have to follow this SOP while working for a BPN.
Definition
N/A |
Related Documents
Form-035 | Bulk Tablet Sampling Form |
Form-210 | Goods Booking Slip |
Form-165 | Pallet ID Form |
Form-190 | Dispensary Label Form |
Form-055 | Material Transfer Order Form |
Form-070 | Material Transfer Order-Return form |
Form-150 | Example-Logbook for Tablet Batch Documents |
Form-160 | FM-1076 Example- Line Clearance, Opening and Cleaning form for Tablet Packing |
Form-170 | Shipper Label Format |
Form-180 | Vacuum Leak Test – New Foil and PVC Roll form |
Form-175 | Vacuum Leak Test – Hourly Form |
Form-200 | In Process Check – Blister and Carton Form |
Form-205 | People Working in the Tablet Packing Line |
Form-195 | In Process Check – Shipper Form |
Form-380 | IBC Identification Label |
Form-145 | IBC Cleaning Tag |
Form-120 | Printed Material Sample Sheet |
Form-125 | Example- Batch Reconciliation Sheet for Tablet Packing |
Form-450 | Deviation Report Form |
Form-540 | Pallet Booking Information |
Form-560 | Test and Retention Sample Log Book |
QMS-020 | Documentation Rule for GMP Documents |
QMS-035 | Deviation Report System |
QMS-090 | Example-Evaluation of Batch Documentation for Tablet Packing |
WAR-075 | Example-Tablet Dispensary Procedure |
WAR-080 | Example-Raw Material Tablet Sampling by Dispensary |
WAR-040 | Finished Goods Transfer to Quarantine and Distribution Warehouse |
MAN-055 | Procedures for Line Clearance, Line Opening and Line Cleaning |
MAN-075 | Example-Tablet Packing Machine and Cartoner-construction, operation and cleaning |
QMS-040 | Shelf Life of Product |
MAN-065 | Example-Operation of Barcode Reader |
MAN-110 | Example-Operation of Checkweigher |
MAN-095 | Vacuum Leak Testing Procedure |
MAN-035 | Packaging Configuration for Production Line |
MAN-115 | Example-Tablet Packing-Start up and In-process Testing |
MAN-060 | Reconciliation of Component and Product |
MAN-120 | Example-Packed Tablet Sampling by Production Personnel for Testing |
EHS Statement
No EHS impact is justified.
Procedure
1. General Instruction
1.1. Phases
Manufacturing Instruction for tablet packing consists of three main phases. Each phase number is a four digits numerical number starting with a single digit e.g. 1, 2, 3 for each separate phase. Therefore each phase can be identified with a whole number like 1000, 2000 or 3000.
1.2. Sub-phases
Each phase can be split into several sub-phases depending on the nature of the phase and ease of identification. The difference between one sub-phase to another is kept 50. Since there could be more than one sub-phases in a phase, the first instruction of a phase is the first instruction of a sub-phase. For example, the first instruction of phase 1000 starts with the sub-phase 1050.
1.3. Instruction number
Each activity needs to be done in a phase is instructed in a statement and is identified with an instruction number. The first instruction number of a sub-phase starts with digit 0010. The difference between one instruction number to another is kept 5.
2. Phases associated in a tablet packing line
2.1. Phase 1000: Dispensing.
Sub-Phase 1050
Perform line clearance in Dispensary
a. Sign all people working in the log book.
b. Check tablet containers for compliance
c. Filling of IBC bins
d. Sending IBCs and Transfer Order to production
e. Complete the phase.
2.2. Phase 2000: Blister Packing
Sub-Phase 2050
a. Signing batch started
b. Sign all people working in the log book
c. Perform line clearance in the packing line
d. Setting up Blister machine and the Cartonner
e. Start Line opening
f. Sampling of all printed components.
g. Coding of blister and carton with BPN and Expiry date
h. Sampling of formed blisters
i. Complete Line opening.
j. Perform all challenges and tests
Vision Camera system
Running in foil
Carton barcode sensor
Leaflet barcode sensor
Checkweigher
Sign Vacuum Leak Test passed
k. Complete the sub-phase
Sub-Phase 2100
a. Checking product quality
b. VLT on new foil and PVC change
c. In process check on coding block replacement
Sub-Phase 2150
VLT of formed coded blisters
Sub-Phase 2200
Temperature and Humidity test
Sub-Phase 2250
a. In process check – blister and carton
b. In process check – Shippers
c. Complete the phase
Sub-Phase 2300
Reconciliation of products and components
2.3. Phase 3000: MI sheet logbook
Sub-Phase 3050
a. Sign all people working in the MI sheet log book
b. Complete the phase
3. Protocol: Manufacturing Instruction for Tablet Packing
PROTOCOL
MI SHEET FOR TABLET PACKING – PRODUCTION
Batch Production Number:
Product Name:
Product Code:
Issued By: (Quality Assurance) Date: |
Checked By: (Production) Date: |
Authorized by: (Quality Assurance) Date |
Purpose for the protocol
This Protocol contains step by step instruction for the operators to follow during tablet dispensing, tablet blister packing and final packing.
Special Instructions
To ensure compliance please remember to sign and date all entries.
The shaded areas needed a Second Independent check, Signature and Date above the highlighter.
To ensure complete documentation of this process please include all additional forms used during the manufacture of this batch and utilize the checklist on next page of this protocol.
All entries are to be clearly written directly onto the MI sheet, signed and dated.
If additional pages of forms are required staple them with this document.
If you need a Deviation Report to rise use Form-450 and follow SOP QMS-035 for understanding.
All material dispensing needs to be checked by a second independent person signed and dated and recorded in the provided log book for stock control.
Expiry date is calculated based on the shelf life. See SOP QMS-040.
Corrections and areas not needed are treated as SOP QMS-020. If no data entry is required clearly mark with N/A, sign and dated.
The density of each product can be found in the SOP QMS-090.
If you experience any difficulty with this process contact your manager or Quality Assurance staff for explanation.
Hand over the completed MI sheet with all other relevant documents associated with this BPN to Quality Assurance Department.
Production to tick and attach any of the additional forms required during the process of the BPN
Forms | Production | QA |
Comments-Section | ||
Form-035 Bulk Tablet Sampling Form | ||
Form-190 Dispensary Label Form | ||
Form-180 Vacuum Leak Test – New Foil and PVC Roll form | ||
Form-200 In Process Check – Blister and Carton Form | ||
Form-195 In Process Check – Shipper Form | ||
Form-175 Vacuum Leak Test – Hourly Form | ||
Form-205 People Working in the Tablet Packing Line | ||
MI sheet for: Dispensing (phase 1000) | ||
Blister Packing (phase 2000) | ||
Log Book (phase 3000) |
Note: QA need to check as they will receive the records with this MI sheet after finishing the batch.
Comments |
BPN: | Issue Date: | |||||||||||||||||||||||||||||||||||||
Product Code: | Packing Line | |||||||||||||||||||||||||||||||||||||
Product Name: | Page: | |||||||||||||||||||||||||||||||||||||
Phase: 2000 | Operating group : Blister Packing | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0010 Operator to sign that the batch has started |
Sign batch started: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0015 If any deviation occur during the process, raise a deviation report, follow SOP QMS-035 |
Follow QMS-035 | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0020 At the start of each shift record in the log book MI sheet the surname of all people working on this BPN on your line including technicians and trainees. Also record new people on the line as they arrive. |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0025 Perform Line clearance according to SOP MAN-055. Fill in the form Form-160 |
Sign Line clearance completed: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0030 Set up the blistering machine, the cartoner, and perform the line opening according to SOP MAN-075 |
Follow SOP MAN-075 | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0035 Enter the Batch Production number and the product code as appeared on the information board. |
This BPN: This product code: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0040 From the warehouse: Enter the material and batch numbers of the materials requisitioned from the ware house for this BPN. Enter the full material number. Attach samples to a sample sheet Form-120 for each batch number of each printed material. |
||||||||||||||||||||||||||||||||||||||
TO # | Material code | Description | Lab. B/N | Confirmed qty. | Sign | Date | ||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0045 Enter the material and batch number of printed carton. |
Carton material no: Carton batch no: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0050 Enter the material and batch number of PVC film. |
PVC material no: PVC batch no: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0055 Enter the material and batch number of printed aluminium foil. |
Printed foil material no: Printed foil batch no: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0060 Enter the material and batch number of leaflets |
Leaflet material no: Leaflet batch no |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0065 Enter the material and batch number of Corrugated carton or shipper |
Shipper material no: Shipper batch no: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0070 Enter the material and batch number of pallet tray |
Pallet tray material no: Pallet tray batch no: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0075 Enter the material and batch number of slip sheet |
Slip sheet material no: Slip sheet batch no: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0080 Enter the material and batch number of printed shipper label. Code the shipper label with the BPN and the expiry which is coded as MMM YYYY in characters for the month and numbers for the year. See SOP QMS-040 for how to calculate expiry date. |
Follow SOP QMS-040 Shipper label material no: Shipper label batch no: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0085 From the Dispensary While packing tablets add the contents of the IBC bin to the hopper on the machine. Write the following from the IBC ID label (Form-380) on the IBC bin. Check IBC bins have cleaning tags (Form-145) on them. For additional spaces use Dispensary Label Form (Form-190) |
Form-380 Form-145 Form-190 |
|||||||||||||||||||||||||||||||||||||
IBC # | Material no | Batch no | No. of tablets | Time | Date | Sign | ||||||||||||||||||||||||||||||||
Total number of tablet delivered: | ||||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0090 Enter number of IBC received |
Total number of IBC received: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0095 Calculate Expiry Date The expiry of this product is based on three years shelf life from the date of tablet manufacture. See SOP QMS-040 for calculation of expiry date. Expiry date must be calculated from the earliest date of manufacture of bulk tablets. The expiry is coded as MMM YY. |
Follow QMS-040 Earliest date of manufacture: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0100 Enter earliest date of manufacturing of the bulk tablets, entering this product code and this BPN in the format of DDMMYYYY/XXXXX/XXXXXX |
Enter Manf. Date/Prod. Code/BPN | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0105 Enter the three years expiry date for this product as MMMYY |
Expiry date confirmed: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0110 Blister and Carton Assemble the batch coder to code the blisters and the cartons with BPN and the expiry based on three years of shelf life, calculated from the earliest date of manufacture for the bulk tablets. Each blister is correctly embossed the BPN symbol as (B), BPN, the expiry symbol as EXP and Exp date. The expiry is three years calculated from the earliest date of manufacture of the bulk tablets. Expiry to be coded with spaces MMM YY |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0115 Sample for blisters and cartons Write the following for a blister sample |
Foil material number: | |||||||||||||||||||||||||||||||||||||
BPN Symbol (B) | BPN | Expiry | Sign | |||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0120 Check on the first coded carton that the abbreviations, BPN and EXP are coded correctly. The expiry is three years. Enter carton material number from the carton |
Carton material number: | |||||||||||||||||||||||||||||||||||||
BPN Symbol (B) | BPN | Expiry | Sign | |||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0125 Sign coding for blister and carton correct |
Sign all coding correct: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0130 Attach samples of coded carton, four consecutive coded blisters and the first foil roll of the sample sheet Form-120. |
Form-120 Sign printed sample taken: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0135 Sign that Line opening form has been completed and signed. |
Sign Line Opening completed: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0140 The machine may now be started for the purpose of carrying out all challenges and test. No finished packs are to be sent for final packaging until all tests are complete and pass. |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0145 Setup and challenge the vision camera system according to SOP MAN-075 for missing or broken tablets or badly formed cups. Load program for the tablet in vision system. |
Follow SOP MAN-075 Sign vision system challenge: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0150 Challenge the machine for running in foil |
Sign running in foil rejected: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0155 Challenge the carton bar code reader according to SOP MAN-065 |
Sign carton bar code reader OK: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0160 Challenge the leaflet bar code reader according to SOP MAN-065 |
Sign leaflet bar code reader OK: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0165 Set and challenge the checkweigher according to SOP MAN-110. If the nominal weight is changed during the process refer to the same SOP. |
Follow SOP MAN-110 Sign checkweigher set correct: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0170 Check set-up cartons removed off line according to SOP MAN-075. |
Sign setup cartons removed: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0175 Check guide roll on the cartonner infeed has been adjusted to suit blister height according to SOP MAN-075 |
Sign guide rail adjusted: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0180 Check the recipe in compaker, packliner and scanware checkweigher has been reloaded according to SOP MAN-075 |
Sign comp/pack liner reloaded: Sign scanware c/w reloaded: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0185 For the following tests failures must be recorded in the batch comment to ensure a complete record of event. |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0190 Perform the vacuum leak test at the beginning of the batch, after maintenance of the thermo-former, after the change of foil or film and one hourly, on four consecutive blisters according to SOP MAN-095. Record the result of the Vacuum Leak Test in the vacuum Leak Test phase. |
Follow SOP MAN-095 Sign start up VLT passed: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0195 Perform the appearance and correct blister and carton coding checks half hourly and record in the “in process checks” phase. |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2050/Instruction no. 0200 Check that all entries have been made for this phase. |
Check phase completed: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0010 Packing The operator must constantly check the quality of the print on the foil during the entire run. |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0015 Record the time and date that packing has started. |
Time/Date packing started: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0020 Pack two blisters of fifteen tablets into each coded carton. Place individual carton into shipper. |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0025 Pack cartons into shippers and stack on a pallet as per SOP MAN-035. |
Follow SOP MAN-035 |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0030 New Foil and PVC Roll For each new foil and PVC roll perform the VLT and material checks and record in the table below. Attach a sample of each new foil roll to the printed material sample sheet Form-120. A sample of PVC is not required. For the both foil and PVC enter the material number. Record N/A for PVC product description. For additional spaces use “Vacuum Leak Test – New Foil and PVC Roll” Form (FM-180). |
Form-120 Form-180 |
|||||||||||||||||||||||||||||||||||||
Roll# | Time | VLT | Material # | Product Description | Sign | |||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0035 Sign once all new foil and PVC rolls used in the batch have been recorded. Ensure samples of each foil roll have been attached to the sample sheet. |
Sign all new rolls recorded: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0040 Changed Coding Block Every time the coding block is removed from the machine at any time during the production the first coded component must be rechecked and a sample attached to the sample sheet. Record the coding block type and batch details in the table below. |
||||||||||||||||||||||||||||||||||||||
Coding block # | BPN | Exp | Sign | |||||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0045 Sign once all packing has been completed |
Sign all packing complete: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2100/Instruction no. 0050 Check that all entries have been made for this phase |
Check phase completed: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2150/Instruction no. 0010 Vacuum Leak Test |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2150/Instruction no. 0015 For the following test, all results including failures must be recorded in the table or batch comments to ensure a complete record of events. |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2150/Instruction no. 0020 The vacuum Leak Test is performed one hourly, after any maintenance of the thermo former and after a change of foil or film. Note: Use the “new foil and PVC roll” table (and Vacuum Leak Test-New Foil and PVC Roll Form) to record the VLT results for the change of foil and film roll. Enter results of VLT performed on four consecutive blisters. Follow SOP MAN-095. Time format is HHMM. Enter the signature. For additional spaces use “Vacuum Leak Test – Hourly” Form (Form-175). |
Follow SOP MAN-095 Form-175 |
|||||||||||||||||||||||||||||||||||||
Time | Vacuum Leak Test | Sign | ||||||||||||||||||||||||||||||||||||
Sub-Phase 2150/Instruction no. 0025 Sign once all VLT have been completed |
Sign all VLT testing completed: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2150/Instruction no. 0030 Check all entries have been made this phase |
Check Phase completed: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2200/Instruction no. 0010 Temperature and Humidity Record the relative humidity and ambient temperature every four hours. The humidity in the packing area must be below 50% RH. Time format is HHMM. Enter the signature. |
||||||||||||||||||||||||||||||||||||||
Time (HH:MM) | Humidity | Temperature | Sign | |||||||||||||||||||||||||||||||||||
Sub-Phase 2200/Instruction no. 0015 Sign once all humidity temperature results have been completed |
Sign all hum/Tem completed: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2200/Instruction no. 0020 Check that all entries have been made for this phase. |
Check phase completed: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0010 In Process Checks |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0015 In process checks are to be performed every half hour at the start up and the end of the batch. Follow SOP MAN-115 |
Follow SOP MAN-115. |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0020 In-process checks table Blister and Cartons. Time format is HHMM. Enter the signatures. For additional spaces use “In Process Check-Blister and Carton” Form (Form-200). |
Form-200 |
|||||||||||||||||||||||||||||||||||||
Time | App Blstr | Blstr BPN | Blstr Exp | App carton | Carton BPN | Carton Exp | Shipp # | Sign | ||||||||||||||||||||||||||||||
Sign all blister and carton inspection passed: | ||||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0025 In process check table for shipper For additional spaces use “In Process Check-Shipper ” Form (Form-195). |
Form-195 | |||||||||||||||||||||||||||||||||||||
Time | App. Ship. | BPN Ship Label | Exp Ship Label | Shipper # | Sign | |||||||||||||||||||||||||||||||||
Sign all shipper inspection passed: | ||||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0030 Sign once all in process checks have been completed |
Sign all in process checks complete: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0035 Retention and Test Samples Take retention and test samples for QA evaluation and laboratory analytical testing according to SOP MAN-120. Log into “Test and Retention Samples Logbook” Form-560. |
Follow SOP MAN-120 Form-560 |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0040 If any additional issue of component is made enter the data from the re-issued Material Transfer Orders into the following table. Take all printed material samples from the additional issues and attach into new sample sheet Form-120 according to SOP MAN-055 |
Follow SOP MAN-055 Form-120 |
|||||||||||||||||||||||||||||||||||||
TO # | Material code | Description | Lab. B/N | Confirmed qty. | Sign | Date | ||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0045 Print out a pallet ID Form-165 and attach to each of the pallet at the front |
Form-165 | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0050 Print out a Goods Booking Slip Form-210 and enter each pallet data in the form, sign and dated by two authorised operators. Record pallet details in this sheet as prepared in the following table according to SOP WAR-040. Use Form-540 if additional spaces are required. Copy the same data into the batch reconciliation Form-125. |
Follow SOP WAR-040 Form-210 Form-540 Form-125 |
|||||||||||||||||||||||||||||||||||||
Pallet # | Pallet qty. | Retention Sample | Stability Samples | GRS # | Sign | Date | ||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0055 Post all raw material and components received during the line opening for this BPN in the Form-125. |
Form-125 | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0060 Record the time and date that packing finished |
Time/ Date packing finished: | |||||||||||||||||||||||||||||||||||||
Sub-Phase 2250/Instruction no. 0065 Check that all entries have been made for this phase |
Check & sign Phase completed: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0010 Reconciliation |
||||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0015 On completion of the batch perform the reconciliation of the components. For the acceptable limit check SOP MAN-060. Refer to form Form-125 |
Follow SOP MAN-060 Form-125 |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0020 Carton Reconciliation |
No. of carton received: No. of carton packed: No. of sample carton: No. of rejected carton: No. of returned carton: Carton % Yield: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0025 Leaflet Reconciliation |
No. of leaflet received: No. of leaflet packed: No. of sample leaflet: No. of rejected leaflet: No. of returned leaflet: Leaflet % Yield: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0030 Enter number of samples taken. Enter number of packs booked out. |
Follow SOP MAN-120 No. of retention plus test samples taken: No of stability sample taken (if required): No. of packs booked out: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0035 Tablet Reconciliation Calculate the number of rejected tablets as shown in the first part. Multiply weight of one empty blister with the number of rejected blisters. Deduct the result from the total weight of rejected tablets and blisters to have the weight of rejected tablet. Divide the result by average weight of one tablet to calculate the number of rejected tablets. |
Wt. of 1 empty blister: No. of rejected blisters: Wt. of rejected blisters: Wt. of rejected tablet and blisters: Wt. of rejected tablets: Av. wt. of 1 tablet: No. of rejected tablets: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0040 Final Tablet Reconciliation |
No. of tablet received: No. of tablet packed: No. of rejected tablet: No. of returned leaflet: Tablet % yield: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0045 Place all rejected tablets and cartons in the security reject bins. Sign packing completed. |
Sign packing completed: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2300/Instruction no. 0050 Check all entries have been made for this phase. Check all DR are completed. Sign the blister packing MI sheet off and send all MI sheets to QA for evaluation |
Check & Sign phase completed: Sigh MI sheet off: |
|||||||||||||||||||||||||||||||||||||
Sub-Phase 2350/Instruction no. 0010 Collect all the batch documents (MI Sheets), records and forms together and logged into Form-150 according to SOP MAN-120. Send the batch document for QA evaluation and release for sale. |
Follow SOP MAN-120 Form-150 |
|||||||||||||||||||||||||||||||||||||
BPN: | Issue Date: | ||||
Product Code: | Packing Line: | ||||
Product Name: | Page: | ||||
Phase: 3000 | Operating group : Logbook | ||||
Sub-Phase 3050/Instruction no. 0010 At the start of each shift record in the log book MI sheet the surname of all people working on this BPN on your line including technicians and trainees. Also record new people on the line as they arrive. For additional spaces use “People Working In Tablet Packing Line” Form (Form-205). |
Form-205 | ||||
Shift # | Date | Time | Initial | Work title | |
Sub-Phase 3050/Instruction no. 0015 Check all entries have been made for this phase |
Check phase completed: |
||||
4. Summary of Changes
Version # | Revision History |
MAN-080 | New |